The bathroom is a place that we are particularly easy to ignore during the decoration process. Some people do not pay attention to the waterproofing, and it will lead to leakage of water in the bathroom in the future. Therefore, the waterproof construction of the bathroom will directly affect my life in the future. Not to be underestimated! This article introduces the acceptance criteria and construction process of the relevant bathroom waterproofing project for everyone. Let's learn together! First, the acceptance criteria for bathroom waterproofing engineering When the bathroom is waterproof and trapped, the owners should also check the inspection to avoid unnecessary disputes. Because if the waterproof material is unqualified or the construction is not standardized, leakage will occur within two or three years, and consumers should carry out necessary supervision on the key aspects of waterproof construction. 1 When you purchase, you must recognize the famous brand: At present, there is a flood of goods in the market, and the toxic materials that the state has ordered to eliminate and ban are also flooded into the homes. Ordinary consumers should choose brand products with high reputation, good reputation, high degree of anti-counterfeiting and international quality system certification. 2 waterproof parts should be comprehensive: the floor and wall of the bathroom (return height is not less than 1.8 meters or full), the floor and wall of the kitchen, balcony (return height is not less than 0.3 meters), all floors of the first floor residence And the wall (returning 0.3 m high), the ground floor and all walls of the basement should be waterproof and moisture-proof. 3 The thickness of the waterproof layer should be sufficient: the thickness of the waterproof layer directly affects its waterproof life. If the thickness of the waterproof layer is reduced, it is equivalent to reducing its waterproof life. 4 The construction process should be meticulous: the joint between the wall and the ground, the yin and yang angle, the water pipe, the floor drain and the periphery of the sanitary ware and the trench in which the cold and heat pipe is laid are the key waterproof parts, and the construction must be meticulous. 5 Closed water test after completion: After the waterproof construction is completed, seal the door and the drain, and store the water for 24 hours in the room to check if there is any leak. Second, the construction process of the bathroom waterproofing project 1. Ground treatment Before the waterproof treatment, the ground must be leveled first. If the ground is uneven or the effect is not good, it may cause cracking and leakage caused by the uneven thickness of the waterproof coating. Floor joints, corners, pipes and other joints should be made of highly flexible and flexible waterproof paint, because the joint between the wall and the floor of the bathroom will be displaced most easily. 2, wall treatment wall treatment to do about 30cm high waterproof coating to prevent water from seeping the wall back to the tide, if the bathroom has a shower room should be waterproof to achieve 180cm, if there is a bathtub, the wall adjacent to the bathtub The waterproof height should be 30cm higher than the bathtub. 3, after the waterproof layer is done, it is necessary to leave a certain amount of time, so that the waterproof layer and the building are better integrated, and then the protective layer is laid on the waterproof layer in the paving brick. During the construction process, it is sloppy. Try to protect the waterproof layer as much as possible. 4. Waterproofing is a concealed project. Subsequent construction may also damage the waterproof layer. If the floor tiles have been laid, do not smash the floor tiles. Use professional seam waterproofing materials to block all the gaps and make them waterproof. . The same applies to the waterproofing project after the waterproof layer of the bathroom. 5. Waterproofing is a systematic project, and the causes and treatment methods of each place are different. Material is the foundation, construction is the key, and follow-up service is guaranteed. Everyone needs to know that construction control is the key link to ensure the waterproof quality of the bathroom . Therefore, we must pay attention to the waterproofing project in the bathroom. The above content is about the whole content of the bathroom waterproofing project. If you want to know more about decoration consultation, please pay attention to the decoration home. network! More related wonderful reading: Bathroom waterproof material price analysis bathroom waterproof material price introduction Bathroom waterproof and leakproof small coups waterproof area method What brand of bathroom waterproof material is good? Waterproof material brand recommendation Bathroom waterproof height practice bathroom waterproof height requirements How much is the waterproof height of the bathroom? Bathroom waterproofing practice Socket Adapter,Universal Plug Adapter,Universal Power Adapter,Cigarette Lighter Adapter Zhejiang Huzhou SCVE Machine & Motor Co., Ltd. , https://www.scve-motor.com
Bathroom waterproofing engineering acceptance bathroom engineering construction process